<dfn id="kdvs9"><acronym id="kdvs9"></acronym></dfn>
  • 
    

    1. Carbon Dioxide Compressor Series A and Series B Successfully Commission in Xinjiang Group’s Purification Workshop

      來源: xinjiang
      編輯: 阿勇
      發(fā)布時間: 2013-06-26
      訪問量: 4419

      Xingjiang- On June 21, the carbon dioxide compression section of Xinjiang Group’s Purification Workshop officially commissioned, sending first flow of air for the coal gas of gasification furnace of purification workshop. 
          To ensure the success of one-time commissioning, workshop leaders deployed tasks in advance and organized employees to re-fasten each bolt at each flange connection part, purge nitrogen pipelines, clean equipment and check and eliminate safety hazards. During commissioning, workshop leaders and professional workers had a whole-process tracking of the commissioning link, strengthened central control analysis, strictly controlled process indicators, coordinated and solved emerging problems, making the entire commissioning process in order and each process indicator up to standard. One-time commissioning was successfully achieved.
          The success of carbon dioxide compression lays a solid foundation for the overall commissioning of purification workshop.

      亚洲毛片高清视频,亚洲成a人片在线观看国产,AV在线黑人无码,成人看精品免费亚洲av专区

      <dfn id="kdvs9"><acronym id="kdvs9"></acronym></dfn>
    2.